You Are Here.
Jump to other pages.
Garage to Train Station, Part Two: Turning one end of my garage from a disaster zone to something that resembles the interior of a late-1800s train station.  Click for bigger photo. Garden Railroading Primer Articles: All about getting a Garden Railroad up and running wellGarden Train Store: Index to train, track, and other products for Garden Railroading
Large Scale Starter Sets: Begin with a train you'll be proud to runBest Choices for Beginning Garden Railroaders: a short list of things you're most likely to need when starting out
Large Scale Track order FormSturdy buildings for your garden railroad.
Large Scale Christmas Trains: Trains with a holiday theme for garden or professional display railroads.Free Large Scale Signs and Graphics: Bring your railroad to life with street signs, business signs, and railroad signs
Garden Railroading Books, Magazines, and Videos: Where to go to learn even more
Collectible Trains and Villages: On30 Trains and accessories designed by Thomas Kinkade and others

Written by Paul D. Race for Family Garden TrainsTM


Please Read: How to Help Our Site at No Cost to You - Some of our articles contain recommendations for products we like and vendors we personally trust. Some of those vendors may pay us a very small commission if you click on a link and buy their products. This costs you nothing at all and helps offset the costs of what we do. So if we point you to something you decide to buy later, please make certain you come back through our site and click on the link directly. Thanks.





























































































































Garage to Train Station, Part 2

This article is a sequel to Garage to Train Station Part 1 describes a bunch of DIY projects that I recently took on to fix up the part of the garage where my trains are being stored. Click to go to article."Garage to Train Station Part 1," which describes a bunch of DIY projects that I recently took on to fix up the part of the garage where my trains are being stored.

By the end of that article, I had re-drywalled part of the garage ceiling, ripped out a huge fire-hazard workbench, spackled and painted the wall I wanted to fix up, moved four chest-heigh wall outlets to standard height, and installed and stained wainscotting and baseboard.

Then I had autumn garden stuff to do and we were blessed with two lovely, warm weeks in November that allowed me to finish the construction of the western extension on my outdoor train garden.

Outlining the Windowframes - Finally, we had a rainy day, so I went back to the garage. I want to fill the windows with pictures that look like an early 1900s coach is stopped at the station.

I found a drawing of the style I wanted, with those quaint arched double windows that became common during the last days of the wooden coaches. It was relatively low resolution, but I hoped I could make it work.

This sleeper uses a window configuration that became common during the last days of wooden coaches.  I don't know the source of this drawing since the site I found it on said it was from a site that has been shut down. If you know, please tell me so I can ask permission and give credit. Click for a slightly bigger drawing.

An old conference room projector, hooked up to a laptop, allowed me to see how to best align the image against the windowframe. Click for bigger photo.Capitalizing on the experience of several years of set-painting from our daughters' high school musicals, I hooked a laptop up to an old digital projector I use to show movies and aligned it to figure outo the best way to show coach details "through the window."

If you look closely, you can see the windowframes. I zoomed and panned the image on my laptop until I was certain that the "snippets" would seem to be showing a passenger coach parked at the station.

Then I traced the shape of the windowframe onto three pieces of foam board, so I would know which part of the foam board would eventually show behind the windowframe (left, below).

Outlining the windowframe onto the foam board so I can be sure that the projected image is aligned properly. Click for bigger photo Using a fine point Sharpie and a straight-edge to trace the drawing onto the foam board. Click for bigger photo

I removed the windowframe and tacked the foam board in its place (above right). Then I used a yard-stick and a fine-point Sharpie to transfer the drawing to the foam board.

The next photo shows the three foam boards. Next I would paint them and install them behind the windowframes. But that waited until cooler weather. There was still much to do outside before we started entertaining visitors this holiday season.

All three foam boards with their portion of the coach drawing outlined and ready to paint. Click for bigger photo.

Painting the Windows - I wanted a color that was halfway between PRR's "Tuscan Red" and the Hogwarts Express' "Maroon." Of course I learned my colors as a child from the Crayola 64- and 128-crayon sets. And in that set, Maroon was a dark red with barely a hint of purple. This year I learned that most colors called "maroon" by modern paint companies are closer to purple than they are to red. :-(

The middle panel with two coats applied.  If I'd bought the flat instead of the satin, I probably could have got away with two coats. Click for bigger photo.I investigated some Barn Reds, Burgundies, and other related colors, and finally decided to try a quart of WalMart's Glidden-branded "Oriental Berry." I also bought a quart of black for the windows.

The "Oriental Berry" turned out to be a richer color than I really wanted, but it was probably closer to the mark than most of the other colors I investigated.

The big mistake I made was buying the "satin" version, not the flat. The "satin" paint showed every brush stroke and took three coats to cover anything like evenly. And every coat I put on caused the foam board to curl just a little more.

The photo to the right shows the middle window with two coats applied.

By the time I put on all three coats, I could no longer see all of my lines, so I had to redraw some of them. Then I mixed the "Oriental Berry" with a bit of white to make a highlight color, then with a bit of black to make a shadow color.

In a couple cases I didn't get the lines exactly as they should be, but since the pictures will be about 40" apart once they're mounted, no one will notice. You probably wouldn't have noticed either, except that I believe in full disclosure (unlike the "gurus" who never admit that they make mistakes).

The three panels with highlights and shadows added.  Click for bigger photo.

The "highlight" color turned out to be brighter than I really wanted, but it gave a sort of "art deco" or Edward Hopper vibe to the panels that I decided I could live with.

When I was done painting, I let everything dry overnight to make certain it was thoroughly dry. Then I stacked the panels on the basement floor with heavy books and paint cans over the top to flatten them out again. Sorry, no photo.

A day or so later, I tacked the panels into the frames and trimmed around the edges.

The three panels tacked into their frames and trimmed around the edges.  Click for bigger photo.

Windowframes Mounted - I took the windowframes to the garage, but other tasks kept me from mounting them right away, including staging trains for the few visiting families we hosted this year.

Finally, I moved things around so that I could get to "The Wall" and tack the windoframes in place. Initially I rested them on the chair rail, but, standing back, they just looked too low. So I set each one on a piece of 1"x6" when I tacked them in again, raising them about 5.5" above the chair rail. It worked better.

The three windowframes tacked into place on the garage wall, along with a repro Regulator clock. Click for bigger photo.

Though I have a two-sided "railway clock" on my outdoor railroad, I chose a Regulator-style clock for the inside - the original Regulators were the standard for railway stations and government buildings throughout the latter 19th and early 20th century.

The gumball machine is a legitimate early-to-mid-1900s model that takes pennies (remember those?). I bought it from a local fellow and filled it with gumballs that my daughter Molly ordered online for me as an early Christmas present. (It wasn't supposed to be early, but someone else in the house insisted on me opening the box. Ooops.)

I bought it because it's the sort of thing you would have seen in a train station back in the day, too.

This stack of old suitcases on the Hogwarts Express platform at Universal Studios provides 'veritas' to the setting. Click for bigger photos.Plans - I'm still looking for a few other details, like an antique wooden freight truck with a stack of old suitcases. That notion comes from Universal Studios Florida, which uses old suitcases to give the platforms at the Hogwarts Express stations "veritas" (one such setup is shown at the right).

I may have a line on the freight truck, but it will be a while before it comes my way, if it ever does.

Also, do any of you have one of those "your weight and fortune" machines you're willing to donate? :-)

Other projects are planned, including a train schedule board and a little "ticked booth" in one corner, but the major work seems to be done.

Keep in Touch

If you're headed toward or past Springfield, Ohio, please let me know, and I'll see if we can work out a quick visit. To the railroad, not to the garage, which is still very much under construction. :-)

Finally, please let us know about your ongoing projects. Ask questions, send corrections, suggest article ideas, send photos, whatever you think will help you or your fellow railroaders. In the meantime, enjoy your trains, and especially enjoy any time you have with your family in the coming weeks,

Paul Race

FamilyGardenTrains.com

Creating a Railroad Timetable - making a blackboard to hold train schedules, complete with craftcutter lettering.  Click to go to article.Proceed to "Creating a Railroad Timetable" - No train station would be complete without a timetable showing arrivals and departures (as well as expected arrivals and departures). We made one with a big piece of underlayment, framed it with scrap lumber, cut lettering for it with a craftcutter, and lined it with striping tape. This one is hinged to a shallow shelving unit that is holding the dvds we sometimes watch while working on projects in our workshop.

Click on the picture to see our status as of January, 2021.

Christmas Preparations and Operations - getting temporary track loops on the new railroad, testing new trains, and entertaining visitors one masked family at a time. Click to go to article.Return to "Christmas Preparations and Operations" - Usually we have a single big Christmas-themed open railroad, and we prepare for it much of the fall. But for safety's sake this year, we decided to scale things back and spread them out. Thanks to the new platform, we were able to have five running trains for visitors to watch, including actual model trains and Thomas and Friends trains. We also had three trains for kids to run, including a Hogwarts Express circling a castle where a dragon is pursuing Harry Potter and his friends.

Click on the picture to see our status as of late December, 2020.

Garage to Train Station, Part 1, fixing up one end of my garage to resemble a Victorian train station interior, including demolition, patching the ceiling and walls, moving electrical outlets, adding wainscotting and baseboard, planning for windowframes with painted backgrounds. Click to go to article.Return to "Garage to Train Station, Part 1" - fixing up one end of my garage to resemble a Victorian train station interior. The initial steps included demolition, patching the ceiling and walls, moving electrical outlets, adding wainscotting and baseboard, and planning for windowframes with painted backgrounds.

Click on the picture to see our status as of early December, 2020.

Westward Expansion 2020, Part 3, completing the deck, lining the deck, adding trim boards to hold the dirt and gravel in place. Click to go to article.Return to "Westward Expansion, 2020, Part 3" - Thanks to a spate of unusually warm weather in early November, I was able to get the new platform finished, lined with vinyl, and bordered with trim boards to keep the dirt and gravel in place.

The next "permanent" improvements will wait for now. In the meantime, we will set out buildings and a temporary loop or to entertain visitors between now and Christmas.

Click on the picture to see our status as of mid-November, 2020.

Westward Expansion 2020, Part 2, Finishing the joists and starting the frame. Click to go to article.Return to "Westward Expansion, 2020, Part 2" - We had to be careful leveling the last joists so the frame, decking, and right-of-way would be as level as possible. Fortunately we were able to get enough lumber to get a good start on the frame.

We also added one last tweak to the frame design to make it easier to extend this platform to its originally planned size, if and when we get a chance to do so.

Westward Expansion 2020, Part 1, Revising our plans, digging holes, attaching joists in preparation for a 104-square-foot addition.  Click to go to article.Return to "Westward Expansion, 2020, Part 1" - With a lumber shortage and warm weather running out, we revised our plans for the next addition, bought what decent lumber we could find, dug holes, installed posts, and attached joists.

We were hoping to get the lumber we need to finish the platform before cold weather set in. Click on the link to see our status as of late September, 2020.

Train Storage Solutions, January 2020, using periods of cold weather to get things sorted in the garage, including shelf building and tips for schlepping trains. Click to go to article.Return to "Train Storage Solutions, 2020" - Using periods of cold weather to get things sorted in the garage, including shelf building and tips for schlepping trains from storage to the tracks.

Click on the following link to see our status as of late January, 2020. https://familygardentrains.com/newbost/20_1_19_shelves/shelves.htm

Planning the last expansion on the NEW New Boston and Donnels Creek RR.  Completing the lower, outside level will require working around existing structures and working within standard decking constraints. Click to go to article.Return to "Expansion Planning, 2020" - Three years after starting a garden railroad in our new home, we are trying to figure out the best way to finish the last loop of our raised platform railroad. How to make room for 10'-diameter curves and more towns and industries, but still keeping things manageable requires some thinking and rethinking.

Click on the photo to see the options we were reviewing for the next and last expansion.

Getting the railroad ready for winter. Click for bigger photo.Return to "Winter Preparation, 2019" - After the big open railroad event, we try to prepare the railroad for the cold months, including populating the railroad with North States bird feeders so it doesn't look empty, adding an air pump and bubblers to the pond, and more.

Click on the following link to see our status as of early December, 2019. https://familygardentrains.com/newbost/19_11_24_winter_prep/19_11_24_winter_prep.htm

Christmas Train Day, 2019.  On our third year in the new home, we host another Christmas-themed open railroad, giving many families a jump start on Christmas celebrations and sharing the experience of running trains with lots of kids. Click to go to articleReturn to "Christmas Train Day, 2019" - Three years after starting a garden railroad in our new home, we host another Christmas-themed open railroad, giving many families a jump start on Christmas celebrations and sharing the experience of running trains with lots of kids.

Click on the photo to see a brief record of our busiest weekend in November, 2019.

Wrapping up construction projects for 2019, getting ready for our annual Christmas-themed open railroad. Click to go to article.Return to "Preparing for Christmas Train Day 2019" - Wrapping up construction projects for 2019 and getting ready for our annual Christmas-themed open railroad. Includes new lighting and other features, providing a temporary home for a Hogwarts Express train, weather issues, and more. Click to go to article.

Click on the following link to see our progress of mid-November, 2019.

Decking the eastern expansion and preparing it for dirtscaping. Click to go to article.Return to Decking the NEW New Boston and Donnels Creek Part 2 - Getting the next part of the railroad ready to install trains. Includes installing 2"x6" decking, vinyl sheeting, edges to hold back the gravel, and corrugated steel panels. It's not done, but it will give us another place to set up trains for our next Christmas-themed open railroad.

Click on the photo to see our status as of late October, 2019.


Installing posts, joists, framing, and decking for the eastern expansion of the NEW New Boston and Donnels Creek. Click to go to article.Return to "Framing the NEW New Boston and Donnels Creek RR - Part 7" - Installing posts, joists, framing, and decking for the eastern expansion of the NEW New Boston and Donnels Creek. Although this installation was complicated by having to fit into an existing framework, the methods used could work for any raised-platform railroad.

Click on the following link to see our progress of early October, 2019.

Installing the in-ground pond and preparing to install the last connecting pool to make our waterfall complete.  Click to go to article.Return to "Planning the NEW New Boston and Donnels Creek RR - Part 5" - Once the major components of the water feature were installed and tested, we decided to add one more bit of railroad proper before our "Christmas Train Day," this November. The addition, about 5'x11', will allow us to put a small train and some scenery closer to eye level for youngsters. Eventually it will be part of the larger plan that will allow us to run our bigger cars and locomotives.

Click on the photo to see our plans for the next addition, as of late September, 2019.

Waterscaping Part 4: Installing the last connecting pool, so the whole planned waterfall is complete except for backfilling, etc.  Click to go to article.Return to Waterscaping Part 4. - Installing the last connecting pool, so the whole planned waterfall is complete except for dirtscaping and planting.

The process included checking the pump, extending the hoses, rescuing toads, building the platform, trimming the platform, testing the pool's location, etc.

Click the photo to go to the article.

Installing the in-ground pond and preparing to install the last connecting pool to make our waterfall complete.  Click to go to article.Return to "Waterscaping, Part 3" - After seven months of crazy long work hours, I finally got some free time to continue working on the railroad. Weather permitting, I often worked all the live-long day. This article describes installing two posts that will eventually support the last connecting pool, then digging the big hole for the in-ground pond, complicated by a three-month drought that turned the ground to concrete.

Click on the photo to see our progress as of mid-September, 2019.

Hosting a Christmas-themed open railroad, our first in the new place, November, 2018.  Click to go to article.Return to Christmas Train Day, 2018 - After two years without our traditional Christmas Train Day (something we did from 2008 through 2015), we were anxious to get started again, even without a huge right of way to show off. The kids' trains, the extra Thomas railroad, the popcorn popper and two Bachmann Christmas trains got a big workout. And the visiting kids all loved it!

Click on the photo to see a lot of last-minute preparations and some photos of the November 10, 2018 event itself.

Putting the walls and windows on our garden railway train shed.  Click to go to article.Return to "Adding a Train Shed Part 6" - Installing the board and batten siding on our train shed, installing the windows, installing the trim, testing the "tunnel entrances," and more.

By the way, going over lumber receipts in early 2019, I couldn't believe I was still siding the train shed in late October, and managed to have an open railroad in mid-November. It is a little crazy how fast things can go together if you have a deadline and a lot of gift cards.

Click on the photo to see our progress as of late October, 2018.

Planning the door, walls, and windows of our garden railway train shed. Click to go to article.Return to "Adding a Train Shed Part 5" - Planning the doors, walls, and windows of our garden train shed.

Includes choosing the siding and windows, installing the door, painting the windowframes, and adding crosspieces to support the vertical siding boards.




Click this link to see the previous article.Return to "Adding a Train Shed Part 4" - Choosing and installing underlayment and drip edge to protect the sheathing until I can get the final roof installed.

Now the roof is waterproof enough to get us through the next couple of months at least, maybe more.


Putting the sheathing and end trim in place on our garden railway train shed. Click to go to article.Return to "Adding a Train Shed Part 3" - Adding fascia, sheathing, and end trim to the in-progress train shed.

I thought about bringing in helpers for this part, but a reader commented on how helpful it was to see how one person could do this sort of thing by himself, so I just kept plugging away.

Click on the photo to see our progress as of September 13, 2018

Click to go to articleReturn to "Waterscaping Part 2" - Getting this year's waterscaping project done (for now at least). Installing and dirtscaping the third level of the waterfall. Installing pump and filter, adding an extra container and modifying the ones we already had installed to keep the water running smoothly. And lots of other tweaking. Includes tips about introducing fish and plants, as well as other information about water features in general that you may find helpful.

Click on the photo to see our status as of August 5, 2018.

Putting the rafters in place on our garden railway train shed. Click to go to article.Return to "Adding a Train Shed Part 2" - Adding rafters to the frame of the in-progress train shed. Now it's starting to look like it might actually be a structure and not just a crazy collection of posts.

The way we got the rafters and ridge board up wouldn't work for everybody, but it worked for us, and hopefully will help other folks to "think outside the box" - literally in this case.

Click on the photo to see our progress as of July 14, 2018.

Click to go to articleReturn to "Adding a Train Shed Part 1" - What started out as a simple addition of a deck to stand on when putting trains on the track got a little more ambitious when I realized that JUST installing the deck this year would require more work next year. So we framed out what we planned to be a train shed attached to the railroad. If it ever gets finished, I can easily put trains on the track at a moment's notice instead of schlepping them out from the garage.

Click on the photo to see our status as of July 9, 2018.

Click to see our first article on adding the waterfall on the NEW New Boston and Donnels Creek garden railroad.Return to "Waterscaping the NEW New Boston and Donnels Creek Part 1," our article on getting the top two layers of the waterfall on solid footing and getting the third layer framed. After we finish decking and dirtscaping the third layer, we will probably add a washbasin or something for the water to flow into, then add a pump to get the waterfall flowing. No big pond until next year at least - too many other projects.

Click on the photo to see our progress as of June 13, 2018.

Click to go to articleReturn to "Dirtscaping the NEW New Boston and Donnels Creek RR, Part 2. - Adding barriers to keep the rocks, dirt, and plants where they're supposed to go, placing platforms and running wiring for buildings, adding rocks, dirt, and plants to the upper level of the railroad.

Click on the photo to see our status as of June 1, 2018.

Click to see the second article on adding 2x6 roadbed to the NEW New Boston and Donnels Creek.Return to "Adding Raised Roadbed to the NEW New Boston and Donnels Creek, Part 2" - Trimming the corners off the roadbed on the upper layer and cutting the pieces that will support the curves on the middle layer. We need to get the upper two tiers of the pond installed before we totally complete this step, so the article doesn't quite show the finished product. You'll see it later as part of other articles.

Click to see our first article on adding 2x6 roadbed to the NEW New Boston and Donnels Creek.Return to "Adding Raised Roadbed to the NEW New Boston and Donnels Creek RR, Part 1" - Sorting out our priorities for the spring and summer of 2018. There a lot of little chores we really should get done before we start on the next big addition. Click to see our plans as of February 27, 2018.

Click on the photo to see our status as of February 20, 2018

Click to go to articleReturn to "2018: Springing into Spring on the NEW New Boston & Donnels Creek RR." - Sorting out our priorities for the spring and summer of 2018. There a lot of little chores we really should get done before we start on the next big addition. Click to see our plans as of February 27, 2018.

Click on the photo to see our status as of February 20, 2018

Click to go to articleReturn to "Dirtscaping the NEW New Boston and Donnels Creek RR, Part 1. - Putting edging around the existing "layers" of the new railroad, and beginning to add gravel and rocks. There were a few test runs, but we got stopped early by bad weather before we could dump the rest of the rocks, gravel, and dirt, much less plant the plants we hoped to get in before snowfall.

Click on the photo to see our status as of November 21, 2017


Click to go to articleReturn to "Decking the NEW New Boston and Donnels Creek RR - Decking the 'middle layer' of our proposed three-tier outdoor railroad. Prepping more track, laying out track and decking to make certain we have measurements correct, installing most of the remaining decking for this layer.

Click on the photo to see our status as of October 25, 2017

Click to go to articleReturn to "Framing the NEW New Boston and Donnels Creek RR, Part 6" - Modifying and finishing the framing on the second layer, cantilevering, using R3 track versus all other pre-curved track formats, finalizing the track plan, why painting the track makes old and new track blend better, and more. This will be the last bit of "framing" in 2017, and it worked out well, considering.

Click on the photo to see our status as of October 15, 2017

Click to go to articleReturn to "Framing the NEW New Boston and Donnels Creek RR, Part 5" - Spreading the billboard-sourced vinyl underlayment on the top layer. Prepping used Aristo track for (hopefully) many more years of service. Laying the first loop of track, attaching power wires with spade terminals, and testing conductivity with a Bachmann streetcar.

Click on the photo to see our status as of October, 10, 2017

Click to go to articleReturn to "Framing the NEW New Boston and Donnels Creek RR, Part 4" - Planning and running the decking for the top layer, testing the track plan, checking clearances, prepping used track with new railjoiners, examining the vinyl I ordered to go over the decking, and more.

Click on the photo to see our status as of September 26, 2017

Click to go to articleReturn to "Framing the NEW New Boston and Donnels Creek RR, Part 3" - Getting the frame finished on the top layer, ordering other things I'd need eventually, deciding on materials for the decking on the top layer (at least).

Click on the photo to see our status as of September 17, 2017

Click to go to articleReturn to "Framing the NEW New Boston and Donnels Creek RR, Part 2" - Once I had the overall frame relatively solid, I hooked up the underground power lines to two GFI plugs that should be in easy reach once everything is finished. I also decided to frame out the top railroad layer while I could still access the center of the railroad easily. Because I was running out of vertical space, I reconfigured that layer. Then after I got the "core" pieces on, I changed my plan again. But the whole thing is getting easier and easier to visualize, and is getting closer to complete with every board I cut and fasten on.

Click on the photo to see our status as of September 7, 2017

Click to go to articleReturn to "Framing the NEW New Boston and Donnels Creek RR, Part 1" - Once I started dropping posts in the holes and screwing things together, I didn't want to stop before I had the basic frame built (for one thing, the wood warps less once it's fastened in place). Now the folks driving down the street past our house (we're on a corner lot) probably wonder if I'm building an elaborate chicken coop, but that's fine with me. I still need to make a few more lumber runs and do a lot more cutting and sawing, but having the basic frame in place should make the next bits a lot easier.

Click on the photo to see our status as of August 10, 2017

Click to go to articleReturn to "Breaking Ground on the NEW New Boston and Donnels Creek" - Okay, in case you wondered if we'd ever get started on the thing, we broke ground in July, using a manual post-hole digger. Well two manual post-hole diggers. But by the end of this article, we're ready for the posts to start going in.

Click on the photo to see our status as of the end of July, 2017

Click to go to articleReturn to "Planning the NEW New Boston and Donnels Creek, Part 4" - Well, the rented post-hole digger fell through, so we dug our vegetable garden with a manual post-hole digger (the scissors kind). In addition, I stake out where the railroad was going to be. Twice. And tweaked the plans again. Sorry about the redo's, but sometimes just walking around the yard trying to visualize things makes me reconsider something that seemed "settled" only a few days before.

Click on the photo to see what we were considering as of late May, 2017

Click to go to articleReturn to "Planning the NEW New Boston and Donnels Creek, Part 3" - We have still not broken ground. In part because we plan to rent a post-hole digger and dig the post holes for our raised vegetable garden and the first phase of the garden railroad at the same time, and we don't have enough lumber on hand yet. (If we didn't break it down into multiple trips, we'd be blowing out the shocks on our minivan.) In the meantime, we used a line level to see if the slope of the back yard was as bad as we thought it was (it's worse), and we did other site preparation, including planting a whole bunch of spruce tree seedlings to eventually give us some privacy in our side and back yard. Plus, I'm still wavering a little on the "where-to-start-first" issue.

Click on the photo to see what we were considering as of late April, 2017

Click to go to articleReturn to "Planning the NEW New Boston and Donnels Creek, Part 2" - More plans. We've moved on from the 2"x6" roadbed-on-posts to a sort of "train-table-outside" plan. Our goals include low-maintenance, high interest, and high reliability. We're also trying to get around having a thousand dollars' worth of dirt hauled into the back yard. If you want to get some idea of what our planning process looks like, reading these through in sequence may help. Or it may drive you crazy.

Click on the photo to see what we were considering in early April, 2017

Click to go to articleReturn to "Planning the NEW New Boston and Donnels Creek, Part 1" - If you're subscribed to our newsletter, you know that we moved just after Thanksgiving in 2016, leaving behind most of the track, a few of the bird feeders, and one Bachmann train set for the new owners. We also left behind a high-maintenance garden that we do not intend to replicate at the new place. This is the first chapter of a new chapter in our lives, which we hope will include a lot of "lessons learned." But first, some serious landscaping had to take place.

Click on the photo to see what we were considering in March, 2017

Click to go to home page of the New Boston and Donnels' Creek RR, Paul Race's home railroad. Return to the New Boston and Donnels Creek RR Page - This is the page describing Paul Race's progress and frequent rework on his own garden railroad, started on a shoe-string budget in 1998, later expanded, and later refurbished several times as issues arose. Issues that Paul hopes to avoid by building the next iteration above ground.

Click on the photo to see the home page of Paul's railroad.


Return to the Family Garden Trains Home PageReturn to Family Garden Trains' Home Page - The home page with links to all the other stuff, including design guidelines, construction techniques, structure tips, free graphics, and more.

To read more, or to look at recommended Garden Railroading and Big Indoor Train products, please click on the index pages below.

Visit our Garden Train Store<sup><small>TM</small></sup> Bachmann Starter Set Buyer's Guide








































































Click to see buildings for your garden railroad
























































Note: Family Garden TrainsTM, Garden Train StoreTM, Big Christmas TrainsTM, BIG Indoor TrainsTM, and BIG Train StoreTM are trademarks of
Breakthrough Communications (btcomm.com). All information, data, text, and illustrations on this web site are
Copyright (c) 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019 by
Paul D. Race. Reuse or republication without prior written permission is specifically forbidden.
Family Garden Trains is a participant in the Amazon Services LLC Associates Program,
an affiliate advertising program designed to provide a means for sites to earn advertising
fees by advertising and linking to amazon.com.


For more information, please contact us

Click to see new and vintage-style Lionel trains.
Click to see new and vintage-style Lionel trains

Visit related pages and affiliated sites:
- Trains and Hobbies -
Return to Family Garden Trains Home page
Return to Big Indoor Trains Home page
Garden Railroading Primer Articles: All about getting a Garden Railroad up and running well Big Indoor Trains Primer Articles: All about setting up and displaying indoor display trains and towns. Garden Train Store: Index to train, track, and other products for Garden RailroadingBig Christmas Trains: Directory of Large Scale and O Scale trains with holiday themes
On30 and O Gauge trains to go with indoor display villages and railroads
Visit Lionel Trains. Click to see Thomas Kinkaded-inspired Holiday Trains and Villages. Big Christmas Train Primer: Choosing and using model trains with holiday themes Free Large Scale Signs and Graphics: Bring your railroad to life with street signs, business signs, and railroad signs Click to see HO scale trains with your favorite team's colors.
- Christmas Memories and Collectibles -
Visit the FamilyChristmasOnline site. Visit Howard Lamey's glitterhouse gallery, with free project plans, graphics, and instructions. Click to return to the Old Christmas Tree Lights Table of Contents Page Click to sign up for Maria Cudequest's craft and collectibles blog.
Click to visit Fred's Noel-Kat store.
Visit the largest and most complete cardboard Christmas 'Putz' house resource on the Internet.
- Family Activities and Crafts -
Click to see reviews of our favorite family-friendly Christmas movies. Free, Family-Friendly Christmas Stories Decorate your tree the old-fashioned way with these kid-friendly projects. Free plans and instructions for starting a hobby building vintage-style cardboard Christmas houses. Click to find free, family-friendly Christmas poems and - in some cases - their stories. Traditional Home-Made Ornaments
- Music -
Heartland-inspired music, history, and acoustic instrument tips.
Best-loved railroad songs and the stories behind them.
Learn important guitar chords quickly, to jump start your ability to play along on any song. With a few tools and an hour or two of work, you can make your guitar, banjo, or mandolin much more responsive.  Instruments with movable bridges can have better-than-new intonation as well. Resources for learning Folk Music and instruments quickly Check out our article on finding good used guitars.
Carols of many countries, including music, lyrics, and the story behind the songs. X and Y-generation Christians take Contemporary Christian music, including worship, for granted, but the first generation of Contemporary Christian musicians faced strong, and often bitter resistance. Different kinds of music call for different kinds of banjos.  Just trying to steer you in the right direction. New, used, or vintage - tips for whatever your needs and preferences. Wax recordings from the early 1900s, mostly collected by George Nelson.  Download them all for a 'period' album. Explains the various kinds of acoustic guitar and what to look for in each.
Look to Riverboat Music buyers' guide for descriptions of musical instruments by people who play musical instruments. Learn 5-string banjo at your own speed, with many examples and user-friendly explanations. Explains the various kinds of banjos and what each is good for. Learn more about our newsletter for roots-based and acoustic music. Folks with Bb or Eb instruments can contribute to worship services, but the WAY they do depends on the way the worship leader approaches the music. A page devoted to some of Paul's own music endeavors.